Archive | Main Library RSS feed for this section

More Topics on Inspection

April 5, 2009

Comments Off on More Topics on Inspection

A Primary Mission of the Council is to promote effective means of surface preparation in the maintenance industry using water and water/abrasive blasting techniques. Checkpoints and final inspections shall be signed off by certified coating inspectors. The implementing contractor shall maintain a certification program for blasters and painters working on the project. The inspection shall […]

Continue reading...

Inspection Log and Inspection

April 5, 2009

Comments Off on Inspection Log and Inspection

A Primary Mission of the Council is to promote effective means of surface preparation in the maintenance industry using water and water/abrasive blasting techniques. Checkpoints and final inspections shall be signed off by certified coating inspectors. The implementing contractor shall maintain a certification program for blasters and painters working on the project. The inspection shall […]

Continue reading...

Floodable Voids

April 5, 2009

Comments Off on Floodable Voids

1.1 Cleaning, Surface Preparation and Painting Requirements for Ballast Tanks and Floodable Voids. MSDS and manufacturer’s ASTM F 718 sheets, Shipbuilders and Marine Paints and Coating Product / Procedure Data Sheet for Coating System Being Applied. NOTE: As stated in section 4.8.2 of the CORE PPI the application of Euronavy ES 301 is exempt from […]

Continue reading...

Potable Water Tanks

April 5, 2009

4 Comments

1.1 Cleaning, Surface Preparation and Painting Requirements for Potable Water Tanks. 1.2 If the PPI checkpoint criteria are met, the following table provides service life expectancy for the listed systems. MSDS and manufacturer’s ASTM F 718 sheets, Shipbuilders and Marine Paints and Coating Product / Procedure Data Sheet for coating systems being applied for specified […]

Continue reading...

Large Tanks with Water from Reverse Osmosis Evaporators

April 5, 2009

Comments Off on Large Tanks with Water from Reverse Osmosis Evaporators

1.1 This T&E PPI provides requirements for cleaning, surface preparation and painting of potable water tanks, 1000 gallons or larger, that are filled with water from reverse osmosis evaporators. The coating described herein is NOT to be installed in smaller tanks, and should not be put in potable water tanks with ships that have flash […]

Continue reading...

Work Notices and Inspection

April 5, 2009

Comments Off on Work Notices and Inspection

A Primary Mission of the Council is to promote effective means of surface preparation in the maintenance industry using water and water/abrasive blasting techniques. 4.2 WORK NOTICE: The contractor shall post the notice at the ship’s quarterdeck or other designated location for each job or separate area at least four hours, but not more than […]

Continue reading...