1.1 Cleaning, Surface Preparation and Painting Requirements for Ballast Tanks and Floodable Voids.
MSDS and manufacturer’s ASTM F 718 sheets, Shipbuilders and Marine Paints and Coating Product / Procedure Data Sheet for Coating System Being Applied.
NOTE: As stated in section 4.8.2 of the CORE PPI the application of Euronavy ES 301 is exempt from relative humidity and dew point requirements since it may be applied on damp surfaces.
6.1 PERFORM SURFACE PREPARATION USING METHOD 2 OF CORE PPI, UHP WATER JETTING.
6.2 (Surface Profile Measurements): Accomplish IAW Ref.
Enter on Appendix 3 TESTEX PRESS-O-FILM tapes used to measure surface profile.
NOTE: Section 6.5.2 of the CORE PPI states that for areas prepared to SSPC-SP-12, UHP water jetted surfaces will retain the surface profile prior to surface treatment.
[Download not found]
April 5, 2009
Main Library