1.1 Cleaning, Surface Preparation and Painting Requirements for Potable Water Tanks.
1.2 If the PPI checkpoint criteria are met, the following table provides service life expectancy for the listed systems.
MSDS and manufacturer’s ASTM F 718 sheets, Shipbuilders and Marine Paints and Coating Product / Procedure Data Sheet for coating systems being applied for specified area.
4.14.1 Prior to use, painting equipment (pumps, hoses, and so forth) shall be flushed clean to remove any residual contaminants or other foreign matter.
Situations arise where very limited touch-up is required, and specified drying times have an adverse impact on ship’s schedule.
7.3.1.1 Two days wait between coats and two days wait after the final coat if the largest single touch-up area is less than 1 ft² and the total touch-up area is less than 4 ft².
NOTE: BETWEEN APPLICATION OF PAINT COATS, ENSURE A MINIMUM OF 48 HOURS OF DRYING TIME IS GIVEN AT A MINIMUM TEMPERATURE OF 70°F.
During application, immediately brush out any runs, drips, sags or puddles.
[Download not found]
April 9, 2010 at 11:27 am
A bully is always a coward.
April 9, 2010 at 11:28 am
There are more ways of killing a cat than choking it with butter.
March 30, 2011 at 6:11 am
I’m not that much of a internet reader to be honest but your blogs really nice, keep it up! I’ll go ahead and bookmark your website to come back later on. All the best
April 17, 2011 at 2:13 pm
Where does the word potable come from, what an odd word really