Tag Archives: rehabilitation

Lead Based Paint on Bridges- Cost Effective Alternatives- FHWA

July 8, 2015

Comments Off on Lead Based Paint on Bridges- Cost Effective Alternatives- FHWA

I get questions about relative cost for various surface preparation methods and the pros and cons.  I refer people to this study as they can plug in their own numbers. “COST EFFECTIVE ALTERNATIVE METHODS FOR STEEL BRIDGE PAINT SYSTEM MAINTENANCE” CONTRACT NO. DTFH61-97-C-00026 was published by the FHWA with Corrpro in September 2001.  The final […]

Continue reading...

The Only Pipeline Integrity Congress Focused Specifically on Crude: Houston 19-Nov-2014

October 28, 2014

Comments Off on The Only Pipeline Integrity Congress Focused Specifically on Crude: Houston 19-Nov-2014

This year’s inaugural Crude Pipeline Asset Integrity Congress is the only event designed specifically for crude oil pipelines. With the continual emergence of new shale plays across the US, crude production has continued to soar and crude takeaway capacity with it. Tens of thousands of miles of crude pipelines now traverse the United States and […]

Continue reading...

Ensuring the Success through Optimal Coatings Techniques 19-20 Nov 2014 Houston

October 27, 2014

Comments Off on Ensuring the Success through Optimal Coatings Techniques 19-20 Nov 2014 Houston

Lydia Frenzel will be speaking on November 20, 2014 in Houston Texas. The Only Crude Pipeline Operator-Led Congress Focused On The Entire Pipeline Asset Integrity Management Strategy: From Selection To Implementation Website: http://www.crude-pipeline-asset-integrity-2014.com Ensuring The Success Of A Project Through The Optimal Selection Of Coating Techniques Reviewing NACE,-SSPC, ISO Surface Preparation Standards so the owner […]

Continue reading...

Fixing Pipeline Problems; Performing Pipeline Rehabilitation Agenda 21- October 2014

August 14, 2014

2 Comments

Performing Pipeline Rehabilitation- Course Programme 21-22 October, 2014, Berlin Germany www.clarion.org DAY 1 Introduction Deterioration Mechanisms                        Causes of pipeline problems and consequences Rehabilitation Options                                What overall methods can be considered In-plant Rehabilitation                               Reconditioning pipe in a stationary facility Out of the Ditch Rehabilitation                  Case Studies of recoating a large diameter gas line in Canada and […]

Continue reading...

Fixing Pipeline Problems- Performing Pipeline Rehabilitation Course Berlin Oct-2014

August 14, 2014

Comments Off on Fixing Pipeline Problems- Performing Pipeline Rehabilitation Course Berlin Oct-2014

This pre event course is scheduled for 21-22 October, 2014 Featuring Sidney A Taylor- Lecturer, and Dr. Lydia M. Frenzel-Lecturer    www.clarion.org The 6th international forum on Technical Conference, Training Courses, and Exhibition 21 – 24 October, 2014 · Estrel Hotel, Berlin, Germany Training courses: 21-22 October Conference: 23-24 October Exhibition: 23-24 October Performing Pipeline Rehabilitation This course […]

Continue reading...

Fixing Pipeline Problems, Berlin, Germany 10-21-2014

August 14, 2014

Comments Off on Fixing Pipeline Problems, Berlin, Germany 10-21-2014

Dr. Lydia Frenzel will be lecturing in the “Performing Pipeline Rehabilitation”  pre event course 21-22 -October-2014 in Berlin, Germay with Sidney A Taylor as the Senior Lecturer. Visit clarion.org for full conference details.  http://clarion.org/fpp/fpp-2014/index.php Speakers and papers are scheduled from: Netherlands, Germany, USA, UK, Czech Republic, Russia, Canada, Italy, France, Abu Dhabi Technical Conference, Training […]

Continue reading...